  The MBR (Membrane Bioreactor) process is widely used in the field of wastewater treatment due to its high efficiency, energy conservation, and environmental protection characteristics. However, in order to ensure the continuous and efficient operation of the MBR system, regular cleaning and maintenance work is essential. This article will provide a detailed introduction to the cleaning and maintenance methods of MBR process.

  1、 Identification and prevention of MBR membrane fouling

  During the operation of MBR membranes, impurities, microorganisms, and other substances in wastewater adhere to the membrane surface, gradually forming membrane fouling. This will affect the permeability of the membrane, thereby reducing treatment efficiency. Therefore, operators need to regularly check the condition of the membrane, and once membrane contamination is found, immediate cleaning measures should be taken.

  2、 Physical cleaning methods

  Backwashing: Rinse the membrane surface with reverse water flow to remove attached pollutants. This method is simple and feasible, but it may not completely remove stubborn stains.

  Air scrubbing: Using the vibration and impact force of bubbles to help remove dirt on the surface of the membrane. This method is very effective for removing minor pollution.

  3、 Chemical cleaning methods

  When the physical cleaning effect is poor, chemical cleaning methods can be considered. Common chemical cleaning agents include acidic cleaning agents, alkaline cleaning agents, and oxidizing cleaning agents. Choosing appropriate cleaning agents and soaking or circulating cleaning according to the degree and type of membrane fouling can effectively remove pollutants on the membrane surface.

  4、 Maintenance measures

  Regular inspection: Conduct a comprehensive inspection of the MBR system on a regular basis, including the integrity of the membrane, the operational status of the system, etc., to ensure the normal operation of the system.

  Replace damaged membrane: Once the membrane is found to be damaged or severely degraded in performance, a new membrane component should be replaced in a timely manner to ensure the treatment effect of the system.

  Recording and analysis: Detailed records of each cleaning and maintenance, analysis of the causes and patterns of membrane fouling, providing a basis for subsequent cleaning and maintenance work.