  The anti-skid and anti-freezing measures of MBR flat membrane equipment mainly include the following aspects:

  1. Treatment of pipelines and valves: Use a small amount of hot water to slowly heat up, and then gradually increase the amount of hot water to prevent equipment damage due to sudden temperature rise.

  2. Maintenance of inspection channels: Ensure that the inspection channels such as MBR flat membrane stairs, corridor platforms, etc. built on the outside are kept clean, especially in winter.

  3. Safety protection: When installing membrane components, scaffolding should be used, and climbing directly on the equipment shell is prohibited. At the same time, staff should use necessary protective equipment to ensure safety.

  4. Anti-freezing measures: Take appropriate measures to prevent membrane components from freezing. If the sewage treatment plant does not have enough sewage, but production cannot be stopped, the following two methods can be used to keep the sewage from freezing:

  ·Continuously add heat to the sewage in the treatment unit

  ·Keep the sewage flowing

  5. Environmental adaptation: In harsh environments, corresponding measures need to be taken to prevent the MBR membrane from sliding and freezing.

  By taking these anti-slip and anti-freeze measures, the MBR flat membrane equipment can be effectively protected, ensuring its normal operation even in winter, and improving its processing capacity and operating stability.